Description de poste
Enfinity Global is looking for a Senior Interconnection Leader with 10-15 years of experience who will be responsible for managing the transmission-level interconnection process for utility-scale solar, battery energy storage projects and large load interconnection across the United States.
The candidate should possess deep technical expertise in FERC regulations, interconnection studies, and grid integration, while demonstrating strong project management and stakeholder coordination skills. This position requires extensive collaboration with US-based teams, utilities, Independent System Operators (ISOs), Regional Transmission Organizations (RTOs), and engineering consultants.
The role demands an individual who is highly organized, strategic, and capable of managing complex interconnection processes from initial feasibility through Commercial Operation Date (COD). The successful candidate will serve as the primary point of contact with transmission providers and ISO/RTO interconnection departments, managing a portfolio of projects totaling multiple gigawatts.
This opportunity provides significant exposure to the US energy market and interconnection reform landscape including FERC Order 2023 implementation. Candidates will work closely with key stakeholders based in the US and will require flexibility to overlap 3-4 hours daily with US business hours.
Key Responsibilities
Interconnection Process Management
- Lead and manage the complete interconnection queue process for transmission-level renewable energy projects (solar, wind, and battery storage) from initial site selection and feasibility through Commercial Operation Date (COD), ensuring compliance with all regulatory and technical requirements.
- Coordinate and submit interconnection applications, deposits, study agreements, and all required technical documentation to utilities, ISOs/RTOs including CAISO, ERCOT, PJM, MISO, SPP, NYISO, and ISO-NE within prescribed deadlines.
- Manage queue positions and track interconnection study milestones including Cluster Studies, System Impact Studies (SIS), Facilities Studies (FS), and Affected System Studies across multiple ISO/RTO markets simultaneously.
- Review, analyze, and challenge interconnection study results including load flow analysis, short circuit studies, stability analysis, and network upgrade requirements to optimize project economics and timelines.
- Negotiate and execute Interconnection Agreements (IAs), Generator Interconnection Agreements (GIAs), and Large Generator Interconnection Agreements (LGIAs), including cost allocation, construction schedules, and milestone payment terms.
- Manage interconnection financial commitments including study deposits, security postings, milestone payments, and network upgrade funding in accordance with FERC-approved tariff requirements.
Technical Coordination & Analysis
- Collaborate with internal engineering teams and external consultants to develop technical specifications, electrical one-line diagrams, and three-line diagrams for interconnection applications, ensuring accuracy and compliance with utility standards.
- Conduct comprehensive due diligence reviews and technical feasibility assessments for potential project sites, evaluating transmission capacity, congestion patterns, and available interconnection options.
- Evaluate and forecast network upgrade costs including reliability upgrades, delivery network upgrades, stand-alone network upgrades, and cost allocation methodologies under shared funding scenarios.
- Assess and recommend alternative Point of Interconnection (POI) options, voltage levels, and interconnection configurations to optimize project economics, construction schedules, and commercial viability.
- Support transmission planning activities including transmission service requests (TSRs), Network Resource Interconnection Service (NRIS) applications, and participation in regional transmission planning processes.
- Monitor, interpret, and implement changes to utilities, ISO/RTO interconnection procedures, FERC Order compliance (Order 2023, 2023-A), queue reform initiatives, and cluster study process modifications across all relevant markets.
Stakeholder Management & Communication
- Serve as primary point of contact with transmission owners, transmission providers, utility interconnection departments, and ISO/RTO interconnection staff, building and maintaining productive long-term working relationships.
- Coordinate closely with US-based development, origination, engineering, legal, and finance teams requiring regular availability during overlapping business hours.
- Participate in ISO/RTO stakeholder meetings, interconnection working groups, and industry forums to stay current on policy developments and advocate for company positions on interconnection reform matters.
- Prepare and deliver regular status updates, risk assessments, and executive summaries to senior management on portfolio-level interconnection progress, upcoming milestones, and potential risks.
- Lead resolution of interconnection disputes, study delays, and billing discrepancies through direct engagement with utility staff, escalation procedures, and formal complaint processes when necessary.
- Manage and provide technical oversight to external consultants and engineering firms supporting interconnection studies, deliverable preparation, and utility coordination activities.
Portfolio Management, Data Analytics & Process Improvement
- Maintain comprehensive interconnection tracking systems, databases, and project management tools for a portfolio of projects totaling multiple gigawatts across various development stages.
- Monitor queue positions, withdrawal risks, restudy impacts, and queue reform implementation effects across multiple utilities and ISO/RTO markets, proactively identifying opportunities and risks.
- Develop and maintain interconnection cost forecasts, timeline projections, and risk registers for financial modeling, budgeting, and project valuation purposes.
- Analyze interconnection study data from customer engagement meetings, scoping meetings, and draft study reports to support informed strategic decision-making and site optimization.
- Track regional transmission planning processes, proposed transmission projects, and policy changes that may impact interconnection feasibility or project economics.
- Develop and implement best practices, standard operating procedures, templates, and lessons learned documentation to improve efficiency and reduce execution risk across the interconnection portfolio.
- Create and maintain interconnection playbooks, process workflows, and training materials for internal teams to ensure consistent execution and knowledge transfer.
Requirements
The candidate will require exceptional written and verbal communication skills, strong technical analysis capabilities, and experience navigating multiple utilities and ISO/RTO markets. The ideal candidate thrives in a dynamic, fast-paced environment with ambitious growth strategies.
Qualifications & experience
Education
- Bachelor's degree in Electrical Engineering, Power Systems Engineering, or related technical field (Master's degree preferred).
Experience
- 10-15 years of hands-on experience managing transmission-level interconnection processes for utility-scale renewable energy projects.
- Proven track record of successfully navigating interconnection queues with at least 5+ projects through to executed Interconnection Agreements.
- Direct experience working with multiple U.S. Utilities & ISO/RTO markets.
- Experience with solar, battery energy storage system (BESS), and large load interconnection projects.
- Background working with IPPs, renewable energy developers, or utilities in project development roles.
Technical Expertise
- Deep understanding of FERC regulations, NERC standards, and transmission planning principles.
- Comprehensive knowledge of Large Generator Interconnection Procedures (LGIP), Large Load Interconnection and interconnection study methodologies.
- Proficiency in interpreting power system studies including load flow, short circuit, stability, and EMT studies.
- Working knowledge of power systems modeling software and tools such as PSS/E, PSLF, PSCAD, PowerWorld, or TARA for reviewing and validating study results.
- Familiarity with electrical single-line diagrams, substation design concepts, protection and control systems, and transmission system configurations.
- Knowledge of reactive power requirements, voltage regulation, and grid code compliance for renewable generation.
Skills & Competencies
- Exceptional written and verbal communication skills.
- Strong project management capabilities with ability to manage multiple complex projects simultaneously.
- Excellent stakeholder management and negotiation skills with utilities, transmission owners, and system operators.
- Proficiency with Microsoft Office Suite, project management, and CRM.
- Strong analytical and problem-solving abilities with attention to detail.
- Self-motivated with ability to work independently in a remote environment.
- Creative thinker, trying to find new ways of optimizing interconnection strategies.
- Hands-on mentality and focus on getting things done.
- Taking ownership and wanting to get things right.
Preferred Qualifications
- Experience with co-located or hybrid projects (solar + storage, wind + storage).
- Familiarity with offshore wind interconnection processes.
- Knowledge of transmission congestion, LMP pricing, and merchant transmission development.
- Experience participating in ISO/RTO stakeholder meetings and working groups.
- Background in power systems modeling software (PSS/E, PSCAD, PowerWorld, etc.).
- Previous experience working for a US-based company from an India office.
In Enfinity Global you will find a very dynamic and multinational environment in one of the most exciting and impactful industries. Here we will foster your professional and personal growth, and you will have the opportunity to actively contribute and make a real impact on climate change.
Let's build our future together.
Salaire habituel pour des postes similaires
EstimationLa moitié centrale des salaires annoncés sur Rejobs dans ce groupe au cours des 24 derniers mois. Cet employeur n’a pas indiqué de salaire.
À propos de ce poste
À propos de Enfinity Global
Présentation de l'entreprise
Enfinity Global, une entreprise énergétique privée
Siège socialMiami, FL, États-Unis
Fondée en2019
TailleEnviron 500 employés dans le monde (source : tracxn.com)
Ce qu'ils font
Enfinity Global est spécialisée dans le développement, le financement, la construction, la propriété et l'exploitation de systèmes photovoltaïques solaires (PV), de systèmes de stockage d'énergie par batterie (BESS) et d'infrastructures électriques associées, adaptés aux clients commerciaux, industriels et institutionnels nécessitant une fourniture d'électricité à grande échelle et continue (source : enfinity.global). L'entreprise se concentre sur le solaire à l'échelle des services publics et les contrats d'énergie à long terme plutôt que sur la fourniture d'électricité aux consommateurs particuliers, mettant l'accent sur une livraison fiable d'électricité 24h/24 et 7j/7 via un portefeuille diversifié sur les principaux marchés mondiaux (source : enfinity.global). Enfinity opère aux États-Unis, en Italie, en Inde, au Japon et dans une grande partie de l'Europe, gérant un vaste pipeline de projets d'énergie renouvelable et de stockage qui soutiennent les acheteurs industriels et corporatifs avec des solutions énergétiques durables (source : enfinity.global). Le modèle commercial de l'entreprise intègre le développement de projets, la propriété d'actifs et les accords d'achat d'électricité à long terme, ce qui en fait un fournisseur de premier plan d'infrastructures énergétiques propres pour les clients d'entreprise à l'échelle mondiale (source : linkedin.com).
Projets et références
Enfinity Global a constitué un portefeuille de projets important avec plus de 39 GW de projets d'énergie renouvelable et de stockage sous gestion d'ici 2025–2026, comprenant 1,2 GW opérationnels et 1,6 GW en construction (source : enfinity.global). Rien qu'en Italie, l'entreprise a déclaré plus de 535 MW de capacité solaire opérationnelle en juillet 2026, avec 460 MW supplémentaires en construction et un pipeline étendu d'environ 8,5 GW de projets solaires et de stockage (source : enfinity.global). La société a également sécurisé 1,8 TWh d'accords bilatéraux dans le cadre du mécanisme Energy Release 2.0 en Italie, liés à environ 120 MW de nouvelle capacité solaire PV répondant à la demande industrielle (source : enfinity.global). Aux États-Unis, Enfinity exploitait 400 MW avec 450 MW en construction et gérait un pipeline de 22 GW début 2026, incluant une extension de 425 MW de stockage d'énergie par batterie au Texas et l'acquisition d'un portefeuille BESS de 425 MW (source : enfinity.global). Au Japon, la société a raccordé 99 MW en 2024 et achevé son premier projet de stockage d'énergie en 2025, en partenariat stratégique avec Mitsubishi HC Capital Energy pour développer le marché BESS (source : enfinity.global). En Inde, Enfinity a sécurisé 2 GW de connectivité pour des projets solaires et éoliens d'ici 2025 et ajouté près de 205 MW de capacité solaire en 2022 (source : enfinity.global). Le portefeuille clients de l'entreprise comprend un PPA de 366 MW avec Microsoft en Italie, avec le premier projet de 33,8 MW AC entré en exploitation commerciale en janvier 2026, ainsi que d'autres PPA importants totalisant plusieurs centaines de mégawatts avec de grands acheteurs corporatifs (source : prnewswire.com).
Développements récents
Au cours des deux dernières années, Enfinity Global a mené une phase solide de levée de capitaux et d'expansion, sécurisant un financement de projet de 481 millions d'euros en Italie et étendant sa facilité de crédit structurée américaine à 245 millions de dollars avec Nomura, ainsi qu'une facilité obligataire de 183 millions de dollars avec Eiffel Investment Group pour soutenir le déploiement de solaire PV et BESS (source : enfinity.global). L'entreprise a finalisé une acquisition de stockage d'énergie par batterie de 425 MW aux États-Unis et réalisé une cession minoritaire de 402 MW en Italie à SOFAZ, diversifiant davantage sa base de capitaux (source : enfinity.global). En outre, Enfinity a annoncé un co-investissement stratégique avec la Strioga Family Foundation pour un projet de stockage de 150 MW en Italie, renforçant son engagement envers les solutions de stockage d'énergie longue durée (source : enfinity.global). La société a reçu deux Inspiratia Energy Transition Awards en 2025 et s'est classée cinquième plus grand vendeur de PPA en Europe selon le rapport Pexapark 2025 (source : enfinity.global).
Travailler chez eux
Enfinity Global offre des opportunités de carrière dans divers domaines tels que le développement de projets, l'ingénierie, la finance, les opérations, le juridique, le commercial et les fonctions corporate, reflétant son modèle intégré de développement d'actifs et de producteur indépendant d'électricité (source : indeed.com). L'entreprise dispose de bureaux à Miami, en Italie, en Espagne, aux Pays-Bas, en Inde et au Japon, avec des offres d'emploi indiquant des options de télétravail aux États-Unis, favorisant la mobilité géographique et la collaboration internationale (source : linkedin.com). Les avantages mentionnés dans les annonces incluent une assurance médicale, dentaire et vision, un plan 401(k) ou de retraite, des congés payés et une couverture en cas d'invalidité, soulignant une structure complète de soutien aux employés (source : indeed.com). La culture d'entreprise se caractérise par une croissance rapide, une portée internationale et un environnement capitalistique axé sur le développement d'infrastructures à grande échelle, le financement de projets et la gestion d'actifs à long terme, attirant les candidats intéressés par l'exécution dynamique et l'innovation dans les énergies renouvelables (source : enfinity.global).
Vos connexions LinkedIn
Consultez vos contacts chez Enfinity Global sur LinkedIn et mobilisez votre réseau au moment de postuler.
Voir les connexions