Rejobs
KK Wind Solutions

Lead, Technical Project Lead - SCADA Systems (m/w/d)

Join KK Wind Solutions as a Technical Project Lead for SCADA Systems in Szczecin, Poland. In this hybrid role, you will oversee project planning, execution, and delivery while ensuring compliance with quality standards. Enjoy a collaborative work environment and opportunities for professional growth.
KK Wind Solutions
KK Wind Solutions
Szczecin, Poland Hybrid Full time UTC+01:00

KK Wind Solutions

Company Overview

KK Wind Solutions, part of KK Group under A.P. Moller Holding

Ikast, Denmark

1978

Approximately 2,400 employees globally (source: rocketreach.co). Reported revenue of $246.6 million, not specified for 2023 or later (source: rocketreach.co).

What They Do

KK Wind Solutions focuses on electrical systems for wind turbines and expands their technology into Power-to-X (PtX), energy storage, power conversion, and electrification. With over 40 years of experience in electro-mechanical solutions for renewable energy, they offer advanced control systems, including hardware such as WTC3, WTC5, WTC6, and MC60 string controller, as well as customized control panels and software for integration and retrofitting (source: kkwindsolutions.com). Their products also include sensors such as anemometers and accelerometers, as well as monitoring systems like SCADA and Turbine Condition Monitoring (TCM®), enhanced through the acquisition of Gram & Juhl in 2020 (source: kkwindsolutions.com). Target markets include wind turbine manufacturers, the aftermarket for existing fleets, and new PtX/electrification, with customers including leading global manufacturers relying on solutions in harsh offshore environments (source: kkwindsolutions.com).

Projects & References

One of the most notable projects that KK Wind Solutions has completed is the equipping of the world's first offshore wind farm at Vindeby, Denmark, in 1991, where they provided control and monitoring systems for 11 Bonus 450kW turbines (source: kkwindsolutions.com). Additionally, they implemented early installations such as the 50kW Windmatic in 1983 and Riisager 22kW in 1978, as well as widespread WTC3 implementations after 2002 as a key product (source: kkwindsolutions.com). Their current expansions include consolidated production in Hammel, Chennai, and Tianjin, as well as the integration of Nissens in 2024 to enhance cooling systems and power conversion (source: kkwindsolutions.com).

Recent Developments

In the past two years, KK Wind Solutions acquired Vestas’ Converters & Control business in 2023, which has provided them with production in Hammel (600+ employees), Chennai, and Tianjin (source: kkwindsolutions.com). They also acquired Nissens Cooling Solutions in 2024 to strengthen their cooling systems and power conversion for wind (source: kkwindsolutions.com). Furthermore, they have validated their climate goals through the Science Based Targets initiative (SBTi) in 2024/2025, aiming to reduce direct operational emissions by 63% and 38% in the supply chain by 2035 (source: kkwindsolutions.com).

Working There

KK Wind Solutions offers roles in R&D, engineering, production, testing, logistics, sales, service, field operations, software development, and support. Their departments include Global Service, production, and specialized teams in control software, sensors, energy storage, and PtX (source: kkwindsolutions.com). Hiring takes place at global locations, including the headquarters in Ikast, Denmark, as well as in Szczecin (PL), Bangalore/Chennai (IN), Tianjin (CN), Madrid (ES), Shanghai (CN), and Kansas (US) (source: windlogisticsgroup.com). The company culture emphasizes innovation, collaboration with OEMs, and data-driven efficiency, with the principles "Drive Longer, Drive Better, Drive Always" in service (source: kkwindsolutions.com).


Last updated on 2026-02-23 | Report an issue

Job Description

In our office in Szczecin, we are looking for a Technical Project Lead - SCADA Systems. In this role, you will lead technical projects within the SCADA Systems department, ensuring successful planning, execution, and delivery of solutions in line with organizational standards and customer requirements.

Please note that this position is based in Szczecin. We work in a hybrid model (3 days in our Szczecin office and 2 days from home), so you should live within commuting distance.

Apply now

Job expired?

Please let KK Wind Solutions know you found this job on Rejobs. This will help us grow and get more people to work on renewable energy!

About the role

December 26, 2025

Full time

Company

March 5, 2026

Hybrid

Wind Energy

KK Wind Solutions

kkwindsolutions.com

  •  Szczecin, Poland

Minimum 5 years

UTC+01:00