Ørsted

Control Engineer

Join Ørsted as a Control Engineer in Barrow-in-Furness, UK, managing transmission network control and ensuring safe operation of renewable assets. Enjoy a collaborative team environment, shift work with nights and days, plus pension and benefits.
Ørsted
Ørsted
Barrow-in-Furness, United Kingdom On-site Full time GBP 72k–108k yearly UTC+01:00

Ørsted

Company Overview

Name

Ørsted

Headquarters

Fredericia, Denmark

Founded

1972

Size

Approximately 8,700 employees globally (source: linkedin.com). Revenues of DKK 82.0 billion (approximately €11 billion) in 2023 (source: orsted.com).

What They Do

Ørsted is a global leader in renewable energy, focusing on offshore wind as its primary business model. The company develops, constructs, and operates large offshore wind farms using both fixed and floating turbines, and offers services in project development, engineering, procurement, construction, operation and maintenance, as well as power purchase agreements (source: orsted.com). Additionally, Ørsted works with onshore wind, solar energy, energy storage, renewable hydrogen, green fuels, and bioenergy, making them a versatile player in the renewable energy market (source: stateofgreen.com). Target markets include Europe, particularly the UK, Germany, and Denmark, as well as the USA, Taiwan, Japan, and South Korea, where they serve large customers such as national grid operators and utilities (source: orsted.com). Ørsted holds a leading competitive position as the world's largest developer of offshore wind with over 15 GW of installed capacity globally and a pipeline of over 37 GW under development (source: orsted.com).

Projects & Achievements

Among Ørsted's notable projects is the Hornsea 2 offshore wind farm in the UK, which, with a capacity of 1.4 GW, was fully commissioned in 2022 and is the world's largest operational offshore wind farm (source: orsted.com). The Race Bank offshore wind farm, also in the UK, was completed in 2018 with a capacity of 573 MW (source: orsted.com). In the USA, Revolution Wind (704 MW) reached financial close in 2024 with operations planned for 2026, while South Fork Wind (132 MW), the first offshore wind farm in the state, began delivering power to New York in 2024 (source: orsted.com). Current major projects include Hornsea 3 (2.9 GW, UK, under construction with first power expected in 2025) and Greater Changhua 4 (112 MW, Taiwan, commissioning in 2025) (source: orsted.com).

Recent Developments

In the past two years, Ørsted has won a contract for the 2.4 GW Atlantic Shores Project 4 offshore wind lease off the coast of New Jersey, USA, in October 2024 (source: orsted.com). They reached financial close on the 1.1 GW Greater Changhua 4 & 5 offshore wind farms in Taiwan in July 2024, valued at over DKK 10 billion (source: orsted.com). In 2023, Ørsted acquired a 20% stake in the 900 MW Nissen offshore wind project in Germany for €227 million (source: orsted.com). Ørsted also secured €1.2 billion in green financing in 2024 and reported an EBITDA of DKK 18.0 billion in 2023 despite project delays (source: orsted.com).

Working There

Ørsted offers roles in engineering (wind turbine technicians, project engineers), project development (site acquisition, permitting specialists), operations and maintenance (offshore service technicians), supply chain, finance, IT, legal, and sustainability analysis, with high demand in offshore wind construction and hydrogen R&D (source: orsted.com). Active recruitment is taking place at offices in Fredericia and Copenhagen (Denmark) for engineering and HQ functions, London (UK) for project development, as well as in the USA, Taiwan, and Germany for offshore wind and hydrogen initiatives (source: linkedin.com). The company culture emphasizes innovation and transformation, as evidenced by their successful shift from fossil fuels, with employee reviews on Glassdoor averaging 4.0/5 for work-life balance and career opportunities (source: glassdoor.com). Documented benefits include competitive salaries, a 37-hour workweek in Denmark, six weeks of paid vacation, pension contributions up to 12%, hybrid work arrangements, and green benefits such as electric vehicle schemes and sustainability training (source: orsted.com).


Last updated on May 22, 2026 | Report an issue

Imagine a future where you play a pivotal role in ensuring the safe and reliable operation of renewable energy assets, directly contributing to the UK's green energy transition.

As a team, we collaborate closely, share expertise, and foster a supportive and solution-focused environment.

You'll play an important role in:

  • managing Transmission Network Control for maintenance and ancillary services.
  • liaising with critical stakeholders, including TSO, DNO, OFTO, and O&M providers.
  • preparing and implementing switching programmes for maintenance works across Offshore Generations and Transmission assets.
  • executing safe operation and escalation of alarms (SCS, protection, SCADA, LV, utility) and initial incident handling.
  • gaining and maintaining specialist technical knowledge to support teams across regions and platforms.

To succeed in the role, you:

  • have solid understanding of Electrical Safety Rules and providing Safety from the System.
  • have held previous Electrical Safety Rules Authorisations as a 400kV SAP or Control Engineer.
  • have experience operating SCADA applications or equivalent experience.
  • demonstrate a proactive approach to self-directed learning and continuous improvement.
  • are comfortable working collaboratively and engaging with a wide range of stakeholders, including NESO/DNO's.
  • possess excellent communication skills and fluency in English.
  • are committed to safe, compliant, and efficient operations.

This role is site based at our Hub in Barrow-in-Furness and follows a shift pattern that will include nights as well as days.

Maybe you've read the above and can see you have some transferable skills, even though they don't quite match all the points. If you think you can bring something to the team, we still encourage you to apply.

Shape the future with us

Send your application to us as soon as possible. We'll be conducting interviews on a continuous basis and reserve the right to take down the advert when we've found the right candidate.

As an applicant or employee, you may request reasonable work and position accommodation or adjustments via [email protected].

Please note that for your application to be taken into consideration, you must submit your application via our online career pages and answer the screening questions relevant for your country. We don't take applications or inquiries from external recruiters or agencies into account for this position.

Position salary range

72,000.00- 108,000.00 + pension + benefits

Pre-employment screening

All offers of employment in the UK are conditional on successful completion of a Baseline Personnel Security Standard (BPSS) check. Further details will be given at offer stage.

Apply now

Job expired?

Please let Ørsted know you found this job on Rejobs. It helps us grow and get more people working in renewable energy.

About the role

August 6, 2026

August 6, 2026

Full time

On-site

Company

GBP 72k–108k yearly

Wind Energy, Energy Storage

Ørsted

orsted.com

  •  Barrow-in-Furness, United Kingdom

Experienced

UTC+01:00