About Scottish Power
Company overview
Scottish Power Limited, a wholly owned subsidiary of Iberdrola
about 9,800 employees (2025); revenue of £6,516 million in 2025
What they do
ScottishPower is the holding company of a group that generates, transmits and distributes electricity and supplies electricity and gas, principally in the UK, through three divisions: Energy Networks, Renewable production and Customer business. It was the first integrated energy utility in the UK to generate 100% of its electricity from renewable sources. Its operating holding company, Scottish Power UK plc, was incorporated on 1 April 1989 as South of Scotland Electricity plc and took the name Scottish Power plc on 1 August 1989.
Energy Networks runs four regulated electricity transmission and distribution businesses, whose cables, power lines and substations serve around 5.9 million connected customers in the Central Belt and South of Scotland, Cheshire, Merseyside, North Shropshire, North Wales, Cumbria and Lancashire. SP Transmission owns the transmission network, and the other three businesses, Electricity North West among them, are distribution network operators. Together they make ScottishPower the UK's second largest distribution network operator, delivering electricity to around 12 million people over more than 170,000 kilometres of network.
The Customer business supplied 4.2 million gas and electricity customers at the end of 2025. It also installs heat pumps, solar panels, battery storage and EV charging, with special tariffs for heat pumps and EV charging and the UK's first national heat pump annual service plan.
Projects and track record
Renewable production develops, builds and operates renewable plants, principally offshore and onshore wind. It runs more than 40 onshore operational sites alongside the East Anglia One and West of Duddon Sands offshore wind farms, 3 GW of operating capacity in all. East Anglia One is owned 60/40 with Bilbao Offshore Holding Limited, and West of Duddon Sands is run jointly with Orsted Schroders Greencoat.
On land, the repowered Hagshaw Hill Windfarm (80 MW) began commercial operation on 31 October 2025: 14 new turbines replaced the original 26, and the site now has five times its original generating capacity. The Harestanes battery (50 MW) entered commercial operation on 15 September 2025, and the Kilgallioch Extension Windfarm (51 MW) in March 2026, adding nine turbines.
At sea, the 1.4 GW East Anglia Three is being built 69 kilometres off the Suffolk coast with 95 Siemens Gamesa turbines, the first UK offshore wind project with 115-metre blades. Its first turbine went up in April 2026, and the £4 billion project has been a 50/50 joint operation with Masdar since a 50% stake was sold to Masdar in July 2025. Its offshore converter station, ScottishPower's first, is the biggest built anywhere in the Iberdrola Group. East Anglia Two is in its construction phase, which runs from 2026 to 2028.
The UK pipeline out to 2038 holds about 3 GW of offshore wind in the East Anglia zone, the 5 GW ScotWind portfolio of the 3 GW floating MarramWind and 2 GW fixed-bottom MachairWind projects, and about 5 GW of potential onshore wind, solar and battery projects. On the grid side, Eastern Green Link 1, developed with National Grid Electricity Transmission, will connect Torness in East Lothian with Hawthorn Pit in County Durham, and Siemens Energy is preferred bidder for the two HVDC converter stations of Eastern Green Link 4.
Recent developments
Iberdrola unveiled a €58 billion strategic plan in September 2025 with the UK as its top investment destination, and ScottishPower is investing £24 billion over five years to 2028. In December 2025 Ofgem's final determination approved ScottishPower's £12 billion investment plans for the transmission network for 2026-2031. In May 2025 the National Wealth Fund committed £600 million to the grid upgrade, part of a £1.35 billion financing package led by Bank of America that supports seven priority transmission projects.
In March 2025 the Competition and Markets Authority cleared the acquisition of an 88% shareholding in Electricity North West, and around 2,550 of its employees joined ScottishPower during 2025. In November 2025 a transaction with Shell gave ScottishPower Renewables full ownership of the MarramWind project.
Working there
ScottishPower has welcomed over 1,000 new hires since announcing headcount growth for 2025 in November 2024. A record 338 graduates and trainees joined in September 2025, in roles spanning engineering, cyber security and project management, from Glasgow to Merseyside, North Wales and London. In 2025 Energy Networks opened a new Edinburgh office for its electricity transmission teams, including those building subsea links off Scotland's east and west coasts, and the group was accredited as a 2025 Top Employer by the Top Employers Institute.
Many roles offer hybrid working. Family leave includes 26 weeks' full pay for maternity and adoption leave and 8 weeks' full pay for paternity leave, and the "Your ScottishPower Benefits" programme lets employees choose from options such as the Share Incentive Plan, the Cycle to Work scheme and buying additional holidays.