Rejobs

Renewable energy jobs at TransAlta

Calgary, AB 1,001–5,000 employees Hydropower · Wind · Bioenergy transalta.com
Alert me to new jobs here
TransAlta
Job type
Workplace
Location above applies to on-site and hybrid roles.
Posted
Reset
6 jobs · updated 2 days ago

Not seeing the right role? Join our talent pool

About TransAlta

Company overview

TransAlta Corporation, listed on the Toronto and New York stock exchanges

Calgary, Canada

about 1,400 employees (2025); revenues of CAD 2,405 million (2025)

What they do

TransAlta is one of Canada’s largest publicly traded power generators, with a fleet across Canada, the United States and Western Australia. Its portfolio includes hydro, wind, solar, battery storage and thermal generation, complemented by asset optimisation and energy marketing. The company is Alberta’s largest producer of hydroelectric power and one of Canada’s largest independent producers of wind power and thermal generation.

At the end of 2025 it had 9,014 MW of gross installed capacity. Of its 88 facilities, 36 were wind and solar sites with 2,587 MW and 24 were hydro facilities with 922 MW. In Alberta, 13 of its hydro facilities lie on the Bow and North Saskatchewan river systems.

TransAlta has operated in Western Australia since 1996, serving extractive industries and energy retailers on and off the grid with gas-fired, solar and battery storage assets.

Projects and track record

TransAlta began as Calgary Power Company, Ltd., whose first project, the Horseshoe Falls hydro plant on the Bow River west of Calgary, was completed in 1911. The company changed its name to TransAlta Utilities Corporation in 1981. In 2000 it bought Vision Quest Windelectric, an Alberta utility with 67 wind turbines and 44 MW of capacity, and in 2009 it bought Canadian Hydro Developers with its wind, hydro and biomass assets.

In May 2024 the 200 MW Horizon Hill wind facility in Logan County, Oklahoma, entered commercial operation, fully contracted to Meta Platforms. It was TransAlta’s 30th wind facility and completed a construction programme started in 2021 that added 800 MW of contracted renewable capacity.

At its Southern Cross Energy North system in Western Australia, where it partnered with BHP Nickel West, TransAlta enabled grid-forming capability on the existing battery, so the isolated network can run on 100% renewable generation during periods of sufficient solar production.

Recent developments

In the second quarter of 2025 TransAlta recontracted its Melancthon 1, Melancthon 2 and Wolfe Island wind facilities with Ontario’s Independent Electricity System Operator. The same year it made a strategic investment in Nova Clean Energy, a renewable energy developer in the western United States, which gives it exclusive options to buy Nova’s advanced-stage projects and access to a pipeline of more than 5 GW.

In December 2025 TransAlta signed an agreement with Puget Sound Energy to convert its 700 MW Centralia Unit 2 facility in Washington state from coal to natural gas, under a contract running to 2044. In February 2026 it signed a memorandum of understanding with CPP Investments and Brookfield for a data centre at its Keephills site in Parkland County, Alberta, with an initial power purchase agreement of about 230 MW and up to 1 GW under evaluation.

In October 2026 TransAlta sold a 49% minority interest in its 500 MW Oklahoma wind portfolio to Ares Infrastructure funds for US$305 million, keeping operational oversight under a long-term asset management agreement. It also completed the purchase of two gas-fired peaking plants totalling 318 MW near Denver, Colorado, for US$1.0 billion.

Joel Hunter, previously chief financial officer, became President and Chief Executive Officer on 30 April 2026.

Working there

TransAlta had 1,350 active employees in 2025, about 32% of them unionised. The benefits it publishes include a competitive base salary, an annual bonus and retirement pension and savings plans, as well as maternity and parental leave top-ups, virtual health care, time off to volunteer and scholarships for employees’ children.

Last updated Nov 16, 2026 · Report an issue