Rejobs

Risk management jobs

115

Building risk registers, running Monte Carlo cost and schedule analysis, and modelling exposure to negative power prices. Grid operators and utilities such as Transgrid and Scottish Power hire most. About the job market

Risk Management
Job type
Workplace
Location above applies to on-site and hybrid roles.
Posted
Organisation size
Reset
115 jobs · 1 filter active · updated 2 days ago
New Risk Management jobs, weekly
Alerts scoped to this search and your location. Unsubscribe any time.

Risk Management jobs in renewable energy

Risk Management Jobs in Renewable Energy

Risk managers in renewable energy identify, quantify, and control the enterprise, commercial, and project risks that decide whether a wind farm, solar portfolio, or transmission line earns its expected return, from construction overruns and counterparty defaults to power price collapses.

The sector learned the cost of weak risk control in public. In October 2023, Ørsted recognised DKK 28.4 billion of impairments on its US offshore wind portfolio and stopped developing Ocean Wind 1 and 2, citing supplier delays, higher long-dated interest rates, and uncertainty over tax credits and permits. None of those risks was exotic. The damage came from all of them arriving at once, which is exactly the combined exposure risk managers are hired to model before a company commits to building a project, not after.

Three kinds of risk work

Project risk is the most common variant in our listings, behind titles such as Project Risk Manager and Preconstruction Manager. The work means building and maintaining risk registers for large capital projects, running quantitative schedule and cost risk analysis (usually Monte Carlo simulations that show how likely a budget or completion date really is), and deciding which risks to insure, contract away, or carry. It sits close to project controls and cost estimation, but the risk manager owns the question of what could go wrong rather than the tracking of what has been spent.

Commercial and market risk grows as projects lose their subsidies. A solar or wind plant selling into the wholesale market is exposed to its own success: in Germany, wholesale prices were negative in 573 hours of 2025, up from 457 in 2024, mostly at midday in summer when solar output peaks. Market Risk Analysts and Quantitative Risk Analysts model that exposure, set trading limits, and assess the credit quality of counterparties to power purchase agreements. Interest rate and currency hedging is narrower work and belongs to treasury and financial risk.

Enterprise risk and GRC (governance, risk, and compliance) roles look across the whole company: climate and physical risk to assets, cyber risk to control systems, regulatory change, and the risk appetite statements boards sign off. Hazard analysis for chemical or high-pressure plant is a separate engineering discipline, covered by process safety.

Who is hiring

Grid operators and utilities hire most. Transgrid in New South Wales needs project risk managers for its transmission build-out, and Snowy Hydro carries the risk profile of the Snowy 2.0 pumped hydro scheme, one of Australia's largest energy projects. Southern California Edison hires risk and compliance staff in a service area where wildfire liability shapes enterprise risk. In Europe, Scottish Power, Vattenfall, Ørsted, Iberdrola Renewables, and EDP Renewables hire across all three variants, and Siemens Energy recruits risk managers into its large project business. Sydney, Glasgow, London, Berlin, and Hamburg lead the locations.

Skills that command a premium

The strongest candidates combine quantitative methods with enough engineering or market knowledge to challenge the people who produce the inputs. A risk manager who can ask why a turbine installation schedule assumes so many workable weather days, or why a price forecast ignores negative-price hours, is worth more than one who aggregates risk scores. Experience with lenders' technical and insurance due diligence is valued, because financing terms increasingly depend on how convincingly a developer shows that its risks are understood and allocated.

Last updated Sep 25, 2026 · Report an issue

Not seeing the right role? Join our talent pool