Rejobs
Berde Renewables
Berde Renewables
3 postes ouverts · Publiée il y a 136 jours

Responsable des Autorisations et de la Conformité

Rejoignez Berde Renewables à Metro Manila comme Responsable Permis et Conformité. Pilotez les approbations réglementaires et permis pour projets solaires avec coopératives électriques. Gérez les autorisations gouvernementales, relations parties prenantes et conformité pour exploitation à long terme. Rôle clé dans une entreprise renouvelable en croissance.

Salaire
150 000–200 000 ₱/mois
Lieu
Metro Manila, Philippines
Lieu de travail
À distance
Type d’emploi
Temps plein
Candidature par e-mail à Berde Renewables

Vérifiez votre boîte de réception.

Sur mobile ? Vous pourrez postuler depuis un ordinateur plus tard.

Description de poste

Position Purpose

The Planning and Permitting Manager leads the planning, regulatory approval, and permitting workstream for solar embedded generation projects developed in partnership with electric cooperatives or other electric distribution utilities, including the EG-to-EC deal mechanism — cooperative power-supply procurement, National Electrification Administration (NEA) approval, and the Competitive Selection Process (CSP) or unsolicited-proposal route — that anchors each partnership. The role secures and maintains all national and local government permits, DOE/ERC regulatory approvals, and embedded generation partnership documentation required to develop, construct, and operate projects, while managing relationships with the National Electrification Administration (NEA), DOE,ERC, LGUs, and host electric cooperatives to ensure project development proceeds on schedule and in full regulatory compliance. Given Berde's Build-Own-Operate-Transfer (BOOT), ISQ-backed asset-ownership model, under which projects are owned and operated by the company for 20+ years, the role also carries ownership-lifecycle awareness — permitting, contracting, and compliance decisions must hold up over the full operating life of each asset, not just through COD. Upon hire, the role assumes continuity of the company's existing live permit and compliance tracker and all open regulatory filings, with a structured transition/overlap period to be completed before 31 August 2026.

Key Responsibilities

  • Develop and manage the end-to-end permitting roadmap and timeline for each embedded generation project, from site identification through to COD.
  • Lead and own the EG-to-EC deal mechanism — structuring cooperative power-supply procurement, securing National Electrification Administration (NEA) approval, and managing the Competitive Selection Process (CSP) or unsolicited-proposal route for each partner electric cooperative or electric distribution utilities.
  • Identify permitting, regulatory, land, and stakeholder risks early and develop mitigation plans to avoid schedule delays.
  • Lead the preparation and filing of DOE applications (Renewable Energy Service/Operating Contract, Certificate of Endorsement) and ERC applications (Certificate of Compliance, PSA/Connection Agreement approval, provisional authority where applicable).
  • Coordinate with the National Electrification Administration (NEA) and electric cooperative Boards/management on embedded generation partnership approvals, board resolutions, and cooperative-level regulatory requirements.
  • Secure environmental compliance certificates (ECC/CNC) with the DENR-EMB and manage related environmental impact assessment (EIA) requirements.
  • Obtain local government permits (business permits, locational clearances, building permits, barangay clearances, tree cutting permits) and manage relationships with LGU offices in project host areas.
  • Lead land acquisition/lease documentation, right-of-way negotiations, and community/social acceptability activities in coordination with local stakeholders and the host electric cooperative or electric utilities including landuse conversion permits and coordination with National Irrigation Administration
  • Lead permitting and regulatory workstreams for solar-plus-storage (battery energy storage system, BESS) projects, including storage-specific DOE/ERC/WESM filing requirements and environmental scoping, consistent with Berde's growing hybrid pipeline
  • Monitor and assess regulatory developments (EPIRA amendments, RE Act IRR updates, ERC/DOE circulars, Distributed Energy Resource (DER), Energy Storage Systems, Distribution/Grid Code revisions) and advise management on implications for embedded generation projects.
  • Maintain a centralized permit compliance tracker and ensure timely renewal of all licenses, permits, and regulatory filings for operating projects, inheriting and continuing the existing live tracker and all open regulatory filings upon hire, with a transition/overlap period completed before 31 August 2026 so that no filing or renewal lapses.
  • Represent the company in regulatory consultations, public hearings, and technical working group meetings with DOE, ERC, NEA, and electric cooperative associations (e.g., PHILRECA).
  • Manage a small team of planning/permitting officers and external counsel/consultants supporting regulatory filings.
  • Collaborate with internal teams to ensure technical, financial and corporate information align with regulatory filing requirements
  • Prepare management reports and executive presentations summarizing permitting status, regulatory risks, critical path activities, and recommended actions.

Qualification and Education

  • Bachelor’s degree in engineering, Environmental Science, Political Science, Law, or a related field.
  • A Law degree or units in Environmental Planning is an advantage, particularly for regulatory and permitting negotiations.
  • Additional training/certification in environmental compliance, urban/regional planning, or regulatory affairs is a plus.

Experience Requirements

  • At least 7–10 years of experience in permitting, regulatory affairs, or project planning within the Philippine energy sector.
  • Direct experience working with DOE, ERC, NEA, DENR-EMB, and LGUs on power generation or embedded generation project approvals.
  • Prior experience partnering with, or working within, an electric cooperative, rural electrification-related organization, or electric distribution utilities is strongly preferred.
  • Track record of successfully securing permits and regulatory approvals within committed project timelines.
  • Experience handling community relations, land acquisition, or right-of-way negotiations in provincial/rural project sites.
  • Experience with cooperative power-supply procurement processes, including the Competitive Selection Process (CSP) or unsolicited-proposal route, is strongly preferred.

Salaire et avantages

150 000–200 000 ₱ /mois

À propos de ce poste

Publié
14 juil. 2026
Fuseau horaire
UTC+08:00
Expérience
7–10 years in permitting, regulatory affairs, or project planning within the Philippine energy sector

À propos de Berde Renewables

Présentation de l’entreprise

Berde Renewables Inc. ; société du portefeuille d’I Squared Capital

Mandaluyong, Philippines

2023

Activités

Berde Renewables, cofondée par Morris Zhou et Patrick Zhu, développe, construit et exploite des projets d’énergie renouvelable décentralisée pour des clients commerciaux et industriels. Ses trois métiers principaux sont l’énergie solaire commerciale et industrielle derrière le compteur, la production intégrée pour les coopératives électriques, ainsi que l’acquisition et le développement de projets d’énergie propre, avec des activités aux Philippines et en Thaïlande. Dans son modèle de contrats d’achat d’électricité (PPA), Berde finance, construit, possède et exploite les installations solaires du client pendant la durée du contrat, puis leur propriété est transférée au client.

L’entreprise est issue de Maoneng Philippines, que le cofondateur Patrick Zhu a lancée en 2017 ; en 2023, Maoneng Philippines et I Squared Capital ont créé une coentreprise pour fonder Berde, qui affirme n’utiliser que des équipements solaires et électriques de catégorie Tier 1. Sa plateforme solaire derrière le compteur couvre Luçon, les Visayas et Mindanao et, au quatrième trimestre 2026, elle comptait plus de 120 MW de projets signés en service ou en construction, plus 200 MW en développement.

Projets et références

En octobre 2023, Berde a signé un contrat d’achat d’électricité de 20 ans avec Holcim Philippines pour des centrales solaires en toiture sur ses cimenteries de Bulacan et de La Union, d’une capacité totale de 5,5 MWc et d’une production attendue d’environ 7,8 GWh par an ; Berde l’a présenté comme le premier projet solaire en toiture de l’industrie cimentière aux Philippines. En avril 2025, les deux entreprises ont étendu leur partenariat aux sites de Holcim à Davao City et à Lugait (Misamis Oriental), portant la capacité totale à 12,79 MWc.

En septembre 2024, Berde a convenu avec Magic Group of Companies d’installer un système solaire de 729 kWc sur le Magic Mall San Carlos, dans le Pangasinan. En août 2025, elle a signé un contrat solaire d’achat d’électricité de 8,4 MWc avec KCC Malls et Biotech Farms, couvrant KCC Mall Gensan, KCC Mall Marbel, KCC Mall Zamboanga et un site agro-industriel de Biotech Farms dans le South Cotabato ; Berde finance les systèmes et assure l’ingénierie, l’approvisionnement et la construction ainsi que l’exploitation et la maintenance. En avril 2026, Big E Food Corporation, fabricant de Lemon Square, a mis en service un système en toiture de 1,685 MWc dans son usine agroalimentaire de Bulacan, construit dans le cadre d’un contrat de construction, propriété, exploitation et transfert de 25 ans.

Actualités récentes

En octobre 2026, Datian Subic Shoes a mis en service 3,06 MWc de solaire en toiture sur ses deux usines de Subic Bay, développés, financés et exploités par Berde dans le cadre d’un contrat de construction, propriété, exploitation et transfert de 20 ans. En juillet 2026, Berde a signé un accord-cadre avec Sungrow et son distributeur régional Solar Hive pour acquérir sur trois ans 200 MW d’onduleurs solaires et 500 MWh de systèmes de stockage d’énergie par batteries destinés à des projets aux Philippines et en Thaïlande.

En mars 2025, Berde a créé une coentreprise avec Power Systems and Solutions Co. Ltd. (PSS) en Thaïlande, avec l’objectif de développer, posséder et exploiter 300 MW de projets renouvelables en trois ans. Aux Solar Quarter Week PH 2025 Leadership Awards, elle a été désignée Solar Company of the Year: Developer.

Travailler dans l’entreprise

Le responsable des opérations d’actifs de Berde dirige les services santé, sécurité, environnement et qualité, ingénierie et conception, gestion de projet et construction, ainsi qu’exploitation et maintenance, et l’entreprise dispose aussi d’une Commercial & Development Division. Son bureau se trouve dans The Podium West Tower, à Mandaluyong. Sur son site, Berde indique être toujours à la recherche de personnes talentueuses et invite les candidats à préciser ce qu’ils recherchent.

Plus d’offres similaires en solaire

Responsable des Autorisations et de la Conformité
Berde Renewables · 150 000–200 000 ₱/mois