Snowy Hydro Limited

Mechanical Engineer

Join Snowy Hydro in Cooma as a Mechanical Engineer for the Snowy 2.0 project. Lead mechanical design, manufacturing quality, and site commissioning while collaborating with multidisciplinary teams. Benefit from a supportive, inclusive workplace and contribute to Australia’s largest renewable energy project.
Snowy Hydro Limited
Snowy Hydro Limited
Cooma, Australia On-site Full time UTC+10:00

Snowy Hydro Limited

Company Overview

Snowy Hydro Limited

NSW, Australia

1949

Approximately 1,000-5,000 employees (source: leadiq.com). Snowy Hydro is a wholly-owned Commonwealth company with no public revenue data available for 2023 or later.

What They Do

Snowy Hydro's core technology focus is on pumped hydro-electricity, gas-fired peaking, diesel peaking, and contracted wind and solar renewables. The company operates 16 power stations and one pumping station, boasting a total generating capacity of over 5,500 MW dispatched to the National Electricity Market (source: snowyhydro.com.au). The Snowy Mountains Hydro-electric Scheme, which is a significant part of their operations, features nine hydro-electric power stations and 16 dams linked by 145 km of tunnels and 80 km of aqueducts, primarily located in Kosciuszko National Park. Additionally, Snowy Hydro manages water storage and diversion under the Snowy Water Licence for irrigation to the Murray and Murrumbidgee systems (source: wikipedia.org).

Projects & Track Record

Snowy Hydro has a rich history of notable projects, including the original Snowy Mountains Hydro-electric Scheme, which was completed in 1974 and delivered a total output of 3,740 MW from seven power stations, such as Guthega, which began operations in 1955 (source: snowyhydro.com.au). The company also operates significant gas assets, including the Colongra Power Station (667 MW, acquired in 2015), Laverton North (320 MW), and Latrobe Valley (300 MW) in Victoria, along with three diesel stations in South Australia totaling 136 MW (source: wikipedia.org). Currently, major projects include Snowy 2.0, which aims to link the Tantangara and Talbingo dams via a 27 km underground tunnel and establish a new pumped-hydro station for 2,000 MW generation and 175 hours of storage, with construction having commenced in 2019 (source: snowyhydro.com.au).

Recent Developments

In March 2018, the Australian Government acquired full ownership of Snowy Hydro by purchasing shares from New South Wales and Victoria, solidifying its status as a wholly-owned Commonwealth entity (source: snowyhydro.com.au). The construction of Snowy 2.0 is a significant advancement in the company's portfolio, marking it as a nation-building pumped-hydro project that commenced in 2019 (source: snowyhydro.com.au). Additionally, Snowy Hydro has secured contracts for over 1,000 MW from ten wind and solar projects, enhancing its renewable energy offerings (source: leadiq.com).

Working There

Snowy Hydro offers a diverse range of roles across various departments, including generation (hydro, gas, diesel operations), engineering, construction, and retail services through brands like Red Energy and Lumo Energy. The company also has opportunities in support functions such as IT, HR, and finance, with hiring occurring at their headquarters in Cooma, the Sydney office, and various project sites across New South Wales and Victoria (source: leadiq.com). The company culture emphasizes community support and has a long history of integrating a multinational workforce, with 65% of the original workforce being migrants from over 30 nations (source: nma.gov.au). While specific benefits are not detailed in available sources, the company is known for its commitment to customer service excellence through its retail brands (source: leadiq.com).


Last updated on Feb 23, 2026 | Report an issue

Snowy Hydro is a dynamic, integrated energy business that has been providing on-demand, reliable energy to Australia for generations. Snowy Hydro owns and operates a powerful combination of generation assets, including the iconic Snowy Hydro-electric Scheme, gas and diesel electricity generating plants, and contracted wind and solar energy in the National Electricity Market. We also provide electricity and gas to over 1.5 million retail customers through our retail brands Red Energy and Lumo Energy.

Snowy 2.0, currently under construction, is Australia's largest committed renewable energy project. This nation-building project will provide on-demand energy and large-scale storage for many generations to come.

About the position

We are seeking a driven Mechanical Engineer to join the iconic Snowy 2.0 project. Based in Cooma, you will play a critical role in the mechanical engineering aspects of the project, from design and manufacturing through to site installation and commissioning.

Reporting directly to the Lead Mechanical Engineer, you will ensure our technical quality standards are met without compromising project schedules, while acting as a key interface between contractors, consultants, and multi-disciplinary teams.

Key Responsibilities

  • Design & Engineering: Conducting comprehensive design reviews of contractor submissions to ensure compliance with Employer Requirements and relevant codes.
  • Manufacturing Quality: Evaluating Non-Conformance Reports (NCRs) and undertaking short assignments (around 0.5 months) for Factory Acceptance Tests (FATs) and manufacturing surveillance.
  • Site Installation & Commissioning: Providing assurance that the plant is built to design, undertaking periodic site inspections (3-4 days), and facilitating the handover from the Contractor to Snowy Hydro.
  • Stakeholder Collaboration: Interfacing seamlessly with other disciplines to ensure integrated designs and constructively resolving conflicts to maintain effective working relationships.
  • Safety Leadership: Maintaining the highest standards of health and safety, leading by example, and actively championing Snowy Hydro's core values.

About the location

This role is located at our Head Office in Cooma NSW, working Monday to Friday. With FIFO or Relocation for the right candidate.

About you

  • Qualifications: A tertiary qualification in a mechanical engineering discipline.
  • Experience: 5+ years experience in a similar role in civil construction, utilities or a related industry.
  • Industry Knowledge: Extensive knowledge of power generation, procurement, construction and commissioning activities.
  • Communication Skills: Excellent verbal and written communications skills, including the ability to convey information and ideas clearly to individuals and groups.
  • Problem Solving: The ability to identify issues, problems and opportunities, make timely decisions, and assist in solution findings.
  • Bonus Skills: An interest in BIM and asset registers could be advantageous.

About our workforce

Diversity and inclusion is important to us: Snowy Hydro has a culture of decency and inclusion, with a commitment to the health and wellbeing of our people and a supportive environment to ensure that everyone - regardless of background - feels included and can succeed. At Snowy Hydro, we recognise that we are made stronger by the unique capabilities and qualities that each individual brings, and we believe in providing an environment that allows that uniqueness to thrive.

Snowy Hydro is proud to be an Equal Opportunity employer. We are committed to the values of Equal Employment Opportunity and provide accessibility accommodations to applicants with physical and/or mental disabilities. If you are interested in applying for a role with Snowy Hydro and are in need of accommodation or special assistance to navigate our website or to complete your application, please send an email with your request to the Snowy Hydro recruitment team at [email protected].

Apply now

Job expired?

Please let Snowy Hydro Limited know you found this job on Rejobs. It helps us grow and get more people working in renewable energy.

About the role

July 9, 2026

July 10, 2026

Full time

On-site

Company

Solar Energy, Wind Energy, Hydropower, Energy Storage

Snowy Hydro Limited

snowyhydro.com.au

  •  Cooma, Australia

5+ years

UTC+10:00