About Steelwind Nordenham

Company overview

Steelwind Nordenham GmbH, a wholly owned subsidiary of Dillinger, part of the SHS group

Nordenham, Germany

2011

EUR 544 million revenue (2025)

What they do

Steelwind Nordenham builds foundations for offshore wind turbines, since 2014 at a plant on the German North Sea coast. Its range covers monopiles and single piece foundations, including onshore work such as coating, secondary steel assembly and technical fittings.

The company produces in series for water depths of up to 60 metres and beyond and also advises customers on design. Its foundations are up to 120 metres long with walls up to 150 millimetres thick; unit weights up to 2,800 tonnes and diameters up to 11.5 metres are planned from 2027. Capacity is about 120 to 150 monopiles a year, depending on design, and production starts with submerged arc welding of Dillinger heavy plate using several welding heads.

The plant sits in the Nordenham-Blexen industrial area, directly on the Weser, opposite Bremerhaven, and its own port has been run by Saar-Rhein Transportgesellschaft since 2015. The site covers 320,000 square metres, including 44,000 square metres of roofed production, 135,000 square metres of storage and 8,200 square metres in six blasting and coating halls. The 200-metre quay is available around the clock and has two heavy-lift cranes of 800 tonnes each. An integrated management system covers health and safety, quality, environmental protection and energy.

Projects and track record

Reference projects include Hornsea One and Racebank in the English North Sea, Merkur, Gode Wind 03 and Borkum Riffgrund 03 in the German Bight, Yunlin in Taiwan and South Fork in the North Atlantic off the US. In July 2020 Parkwind and Steelwind agreed the fabrication of 27 turbine monopiles and one for the offshore substation of the Arcadis Ost 1 wind farm in the Baltic Sea.

In May 2022 EnBW selected Steelwind to make the monopiles for the He Dreiht offshore wind farm, whose 64 turbines total 960 MW. For Baltic Power in the Polish Baltic Sea, Steelwind produced a total of 78 monopiles from January 2024.

In October 2024 RWE signed a framework agreement with Steelwind for up to 300 monopile foundations. From 2027 Steelwind reserves capacity for 320,000 tonnes of steel over 24 months, enough for about 200 foundations, and a 12-month extension would add about 100 more. They are meant for offshore wind farms that RWE plans to commission in Europe from the end of 2029.

Recent developments

In October 2025 Steelwind loaded out the final three monopiles for the 1.2 GW Baltic Power project, completing all 78 in 26 shipments from its own port. In August 2026 it shipped the last foundations for Baltica 2, a 1.5 GW wind farm in the Polish Baltic Sea. For that project it made 34 monopiles from around 56,000 tonnes of steel; the largest are about 102 metres long, up to 10.5 metres in diameter and weigh up to 1,884 tonnes.

Since 1 January 2026 Korbinian Ott has been commercial managing director, leading the company with Dr Andreas Liessem. Ott is responsible for sales, project management, controlling and digitalisation, Liessem for the technical business and human resources.

In March 2025 Dillinger reported the completion of the HL-Blech research project, funded by the German economy ministry, which developed new steel grades. Steelwind, as an associated partner, ran its own high-performance welding processes on the new materials.

Working there

Steelwind lists pay under its own company pay agreement, a company pension and occupational disability insurance, group sickness benefit insurance, staff discounts, bike leasing and a canteen. Flexible working hours and mobile working are available depending on the role.

In November 2026 the plant is hiring welders and steel fabricators, among others, plus a head of welding engineering and a team leader for non-destructive testing. For 2027 it offers apprenticeships such as mechatronics technician and structural metal mechanic, and a dual degree in electrical engineering.

Students can do internships, working-student jobs and theses at Steelwind in production and manufacturing engineering, quality management, design engineering or business administration.