Not seeing the right role? Join our talent pool
Agrivoltaics jobs in renewable energy
Agrivoltaic projects put solar panels and farming on the same land: crops grow under raised modules, or sheep graze between the rows. In the US, Silicon Ranch hires technicians to run sheep and pasture on its solar sites. In Italy, where a 2026 law steers solar on farmland towards agrivoltaic designs, Qair and GOLDBECK SOLAR hire developers and engineers.
What the jobs involve
- Agrivoltaic technicians (Silicon Ranch's entry grade is "Ranch Hand") move sheep between paddocks, put up temporary fencing and water lines, drive tractors and mowers, and reseed eroding ground under the panels.
- Project development managers take a site from scouting to ready-to-build: land rights, a grid connection, and permits under regional agrivoltaic rules.
- Technical experts and tender specialists at engineering, procurement, and construction (EPC) contractors review permit and grid connection files, write the technical part of construction bids, and pick subcontractors.
Who is hiring
Silicon Ranch bases its technicians in Georgia and sends them between sites; its general-interest post is a talent pool, not an opening. In Italy, Qair Italia recruits developers in Milan and Potenza, and GOLDBECK SOLAR, a German utility-scale solar contractor, is building its first Italian projects.
Skills and qualifications
Field technicians need a high-school diploma, experience with sheep grazing and farm machinery, and a driving licence. A degree or training in agriculture or animal science is preferred, and Silicon Ranch invites recent graduates and veterans to apply.
Italian development and EPC roles ask for an engineering degree (electrical, energy, or civil), fluent Italian and English, and working knowledge of Italian permits: the single authorisation (AU), the regional PAUR procedure, the simplified PAS, and environmental impact assessment (VIA). Grid connection experience and AutoCAD count. Agronomy graduates enter through internships such as Nadara's agrivoltaic one in Milan, which asked for a master's in agriculture and basic AutoCAD and GIS. The solar energy career guide compares pay by country.
What is changing
Italy's Law 4 of 15 January 2026 limits conventional ground-mounted solar on agricultural land to a few listed area types but always allows agrivoltaic plants with raised modules (LavoriPubblici). The developer must attach a professional's sworn statement that the plant keeps at least 80% of the land's gross saleable farm output, and the municipality checks for five years that farming continues. Italian farmland projects therefore need agronomy in the permit file from the start.