Rejobs

Wind resource assessment jobs

10

Measuring the wind at a candidate site with LiDAR and met masts and turning it into the P50 and P90 yield estimates lenders size their debt on. Consultancies, developers and OEMs all hire, Germany most of all. About the job market

Wind Resource Assessment
Job type
Workplace
Location above applies to on-site and hybrid roles.
Posted
Organisation size
Reset
10 jobs · 1 filter active · updated 11 days ago
New Wind Resource Assessment jobs, weekly
Alerts scoped to this search and your location. Unsubscribe any time.

Wind Resource Assessment jobs in renewable energy

Wind Resource Assessment Jobs in Renewable Energy

Wind resource assessment is the measurement and modelling of wind at a candidate site, including wake losses between turbines, to produce a bankable estimate of how much electricity a wind farm will generate over its life. Every project passes through it before a turbine is ordered, and the pipeline is large: WindEurope expects Europe to add 187 GW of wind capacity between 2025 and 2030, after installing 16.4 GW in 2024.

What assessors actually do

The work starts with measurement. A campaign typically runs for at least a year, using ground-based or floating LiDAR, which measures wind speed with lasers, often alongside a meteorological mast. Assessors clean and correlate that data against long-term reanalysis records, then use flow models such as WAsP, WindPRO, or computational fluid dynamics to extrapolate it across the site and model how each turbine's wake slows the wind for its neighbours. The result is an energy yield assessment expressed as P50 and P90 values, the production levels a project is expected to exceed with 50% and 90% probability. Lenders size debt on the P90, so a few per cent of error in a yield study moves millions in financing.

Since March 2025 the discipline has had its own international standard. IEC 61400-15-1 defines how the long-term wind and flow conditions of a site are measured, predicted, and documented for turbine suitability, which pushes consultancies and developers towards more uniform methods and reporting. Analysts who combine meteorology with statistics, Python for time-series work, and GIS for siting constraints fit the profile most employers describe.

Who is hiring

Three groups employ assessors. Independent technical advisers such as Natural Power write the yield reports that banks and investors rely on. Developers such as UKA, wpd, ENERTRAG, BayWa r.e., and EDP Renewables keep assessment in-house, and in German listings the work is often part of a broader "Projektentwickler Wind" role that also covers land, permits, and grid. Turbine makers such as Nordex hire wind and site engineers who check that a proposed layout keeps loads within the turbine's design class, which ties the work to wind turbine engineering.

Germany carries most of the listings, clustered in Hamburg, Rostock, Bremen, and Dresden, where developers and manufacturers run large onshore wind teams. Delft and Paris add consultancy and developer roles, and Chennai hosts engineering centres for turbine makers.

Where the field is heading

Three changes define current hiring. LiDAR has replaced tall met masts on many new campaigns, and floating LiDAR is now the standard way to measure offshore before a platform exists. Repowering is creating a second market: assessors model how larger, taller turbines will perform on sites that already have years of operating data, which is a different problem from a greenfield study. And the boundary with operational forecasting is blurring, because the same models that predict a site's long-term yield also feed short-term generation forecasts for trading desks. Assessors who can move between the two are well placed as wind fleets grow and their output has to be sold hour by hour.

Last updated Sep 25, 2026 · Report an issue

Not seeing the right role? Join our talent pool