Rejobs

Renewable energy jobs at wpd

Bremen, Germany 1,001–5,000 employees Wind · Solar · Energy storage wpd.de
Alert me to new jobs here
wpd
Job type
Workplace
Location above applies to on-site and hybrid roles.
Posted
Reset
10 jobs · updated 21 days ago
The positions below have closed. Set up a job alert

Not seeing the right role? Join our talent pool

About wpd

Company overview

wpd GmbH

Bremen, Germany

1996

about 1,400 employees

What they do

wpd was founded in 1996 by Dr Klaus Meier and Dr Gernot Blanke, as a two-person business in Bremen. Today it plans, finances, builds and operates wind and photovoltaic projects in 32 countries; its own portfolio holds projects with 3,644 MW, and its project pipeline comprises 38,545 MW of onshore wind and 8,015 MW of solar. Worldwide, wpd has built 2,840 wind turbines with 7,175 MW.

Since 2016 wpd has been strongly expanding its work in solar energy: it operates about 142 MWp of solar capacity worldwide and is developing a further 8,015 MWp, in countries including Germany, the USA, Belgium, France, Greece, Taiwan and the Philippines. Since 1998 the commercial and technical operation of wind farms has been handled by its sister company wpd windmanager. The management consists of Dr Gernot Blanke (CEO), Dr Hartmut Brösamle (COO) and Björn Nullmeyer (CFO).

Projects and track record

wpd built its first wind farm, Olzheimer Berg, in 1997; in 2005 it entered international project finance with a 50 MW project in Taiwan, and in 2015 its own wind farm portfolio passed 1,000 MW. A 10 MW wind farm for the BMW plant in Leipzig went into operation in 2013, followed by the 288 MW Butendiek offshore wind farm in 2015 and the Nordergründe offshore project in 2017.

In 2016 wpd won 350 MW in an auction for onshore wind farms in Chile, and in 2021 it built the Torozos wind farm in Spain, with about 170 MW. By 2022, after 20 years in the French market, wpd France had built 508 MW and 215 turbines, and in 2023 wpd Taiwan erected its 200th wind turbine, in the Chuangwei II project.

Recent developments

In the onshore wind auction of November 2025, wpd won awards for 23 projects with about 587 MW, the highest volume it has ever reached in a single auction; with 1,135 MW, 2025 became its most successful auction year. The February 2026 round brought nine projects with about 300 MW, and in July 2026 wpd reported a further 156.9 MW. At that time it was building wind turbines with over 1 GW in Germany.

In November 2025 a 53.5 MWp solar park went into operation at Gerbstedt. There wpd for the first time connected wind and solar at one shared grid connection point: its own substation already takes power from the Gerbstedt wind farm, eight turbines repowered in 2021.

In June 2026 wpd and unlimited energy started building the Buckow wind farm in Brandenburg, with eight Nordex turbines of 5.7 MW each; commissioning is planned for spring 2027. On 19 September 2026 the Bredentin wind farm was inaugurated, five turbines with over 29 MW. In February 2026 wpd signed a long-term PPA with Zweckverband Bodensee-Wasserversorgung for power from the 7.23 MWp Bodman-Ludwigshafen PV project.

In October 2025 wpd solar France began building the Marcy solar park in the Nièvre department, with 140.6 MWp on 187 hectares, developed by wpd partner Cryo. Together with five local farmers, sheep are to be raised under the modules and cattle on the surrounding land.

On 1 June 2026 Higashi Izu Furusato in Shizuoka Prefecture, wpd’s first onshore wind project in Japan, began commercial operation. Its three Enercon turbines, with 7.48 MW in total, were developed in a joint venture with the GPSS Group, and the power goes to Nomura Real Estate Development under a corporate PPA.

Working there

wpd has teams in 29 countries at 75 locations. In Germany it has offices at 19 locations, from Schleswig to Munich; the Bremen headquarters has stood directly on the Weser since 2014, in two office buildings named LUV and LEE.

Its job openings are filed under PV/solar, commercial project development, landscape planning, project realisation, project development, civil engineering, electrical engineering, permitting and land-use planning, legal, and project sales and M&A. Benefits include mobile working for 40% of weekly hours, 30 days of annual leave on a full-time basis, company fitness through EGYM Wellpass or Hansefit, bike leasing through Businessbike and regular induction days for new colleagues.

Last updated Nov 16, 2026 · Report an issue