Rejobs

Utility-scale solar jobs

Developers secure land and grid connections, then site crews pile, assemble trackers, and commission ground-mounted PV plants. US sites hire labourers and equipment operators, and Clearway and AES train beginners.

About the job market
Utility-scale Solar
Job type
Workplace
Location above applies to on-site and hybrid roles.
Posted
Organisation size
Reset
New Utility-scale Solar jobs, weekly
Weekly email for this search. Unsubscribe any time.

Not seeing the right role? Join our talent pool

Utility-scale Solar jobs in renewable energy

Utility-scale solar teams develop, build, and run ground-mounted PV plants that sell power to the grid, typically tens to hundreds of megawatts on one site. Most openings below are in the United States, where EPC contractors such as CoVolt Power (formerly Signal Energy), DEPCOM Power, and SOLV Energy staff the construction sites.

What the jobs involve

  • Developers secure land, permits, and a grid connection.
  • Engineers design the civil works, cabling, and substation, or model the plant for grid studies.
  • Superintendents, foremen, and field engineers run the build: piling, trackers, modules, cabling, and commissioning.
  • Estimators and contract managers price and manage EPC contracts.
  • Solar O&M technicians and control-room operators repair inverters and trackers, switch substations, and monitor plants through SCADA.

Who is hiring

Blattner also builds plants. Developers and owners hire their own site and office staff: Strata Clean Energy in Durham, North Carolina, Clearway Energy Group, Invenergy, SB Energy, Cypress Creek Renewables, Recurrent Energy, Silicon Ranch, AES, and Leeward. Array Technologies makes trackers, and Intersect Power builds solar, storage, and substation campuses for Google data centres.

In Europe, GOLDBECK SOLAR hires for Poland and beyond, Elgin Energy builds in Britain, Ireland, and Italy, and Photosol offers construction internships in Italy.

Skills and qualifications

US sites hire general labourers and heavy-equipment operators; electricians need a state licence. Silicon Ranch takes maintenance technicians without solar experience if they have worked on DC, AC, and medium-voltage equipment, and Clearway and AES train beginners. Construction managers need an engineering or construction-management degree, and SOLV prefers experience on plants of 200 MW or more. Grid engineers use PSS/E or PSCAD. Developers need a degree, a driving licence, and knowledge of a regional power market such as CAISO. Graduates start as field engineers or interns. The solar energy career guide compares pay by country.

What is changing

In 2025, utility-scale plants employed more of the EU's solar workforce than rooftops for the first time, and 85% of Spain's (SolarPower Europe, October 2026). The report expects rooftops to lead again by 2030, as low prices and curtailment (forced output cuts) slow new Spanish plants.

In the US, projects that missed the 4 July 2026 construction-start deadline must run by the end of 2027 to keep tax credits. Wood Mackenzie puts the pipeline that met it above 200 GWdc (September 2026), enough to keep construction crews busy for now.

Last updated Nov 13, 2026 · Report an issue